Indexed by:
Abstract:
Precise forecasting of the thermal parameters is a critical factor for the safe operation and fault incipient warning of the ultra-high voltage (UHV) transformers. In this work, a novel multi-step forecasting method based on the long- and short-term time-series network (LSTNet) with the conditional mutual information (CMI) is proposed for the UHV transformer. To improve the computational efficiency and eliminate the redundancy, the CMI-based feature selection algorithm is applied to analyse the correlation between the original monitoring parameters and construct the optimal feature subset. LSTNet, which is composed of a convolutional layer, recurrent layer and recurrent-skip layer, is utilized to capture both the short-term nonlinear characteristics and the long-term periodic characteristics. The LSTNet model is established to forecast the variation tendency of the oil and winding temperatures for different locations in the UHV transformer. The results show that the proposed method significantly enhances the accuracy in both one-step and multi-step thermal parameters forecasting and achieves better performance in terms of the RMSE and MAE compared with other existing methods.
Keyword:
Reprint 's Address:
Email:
Version:
Source :
IET ELECTRIC POWER APPLICATIONS
ISSN: 1751-8660
Year: 2022
Issue: 5
Volume: 16
Page: 548-564
1 . 7
JCR@2022
1 . 5 0 0
JCR@2023
ESI Discipline: ENGINEERING;
ESI HC Threshold:66
JCR Journal Grade:3
CAS Journal Grade:4
Cited Count:
WoS CC Cited Count: 15
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 1
Affiliated Colleges: