Indexed by:
Abstract:
As environmental contamination becomes more and more severe, enterprises need to consider optimizing environmental criteria while optimizing production criteria. In this study, a multi-objective green flexible job shop scheduling problem (MO GFJSP) is established with two objective functions: the makespan and the carbon emission. To effectively solve the MO GFJSP, an improved chimp optimization algorithm (IChOA) is designed. The proposed IChOA has four main innovative aspects: 1) the fast non-dominated sorting (FDS) method is introduced to compare the individuals with multiple objectives and strengthen the solution accuracy.2) a dynamic convergence factor (DCF) is introduced to strengthen the capabilities of exploration and exploitation. 3) the position weight (PW) is used in the individual position updating to enhance the search efficiency.4) the variable neighborhood search (VNS) is developed to strengthen the capacity to get out of – escape the local optimum. By executing abundant experiments using 20 benchmark instances, it was demonstrated that the developed IChOA is efficient to solve the MO GFJSP and effective for reducing carbon emission in the flexible job shop. © 2024 – IOS Press. All rights reserved.
Keyword:
Reprint 's Address:
Email:
Version:
Source :
Journal of Intelligent and Fuzzy Systems
ISSN: 1064-1246
Year: 2024
Issue: 4
Volume: 46
Page: 7697-7710
1 . 7 0 0
JCR@2023
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 2
Affiliated Colleges: