• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
成果搜索
High Impact Results & Cited Count Trend for Year Keyword Cloud and Partner Relationship

Query:

学者姓名:付礼鹏

Refining:

Year

Submit Unfold

Type

Submit Unfold

Indexed by

Submit Unfold

Former Name

Submit

Language

Submit

Clean All

Sort by:
Default
  • Default
  • Title
  • Year
  • WOS Cited Count
  • Impact factor
  • Ascending
  • Descending
< Page ,Total 1 >
Safety risk propagation in complex construction projects: Insights from metro deep foundation pit projects SCIE
期刊论文 | 2025 , 257 | RELIABILITY ENGINEERING & SYSTEM SAFETY
WoS CC Cited Count: 4
Abstract&Keyword Cite Version(2)

Abstract :

Insufficient examination of safety risk propagation within complex construction projects (CCPs) leads to defective risk responses. This study attempts to exemplify metro deep foundation pit projects to investigate the mechanisms underlying this propagation. The interaction network of safety risk factors is constructed utilizing association rule mining and link prediction. A modified susceptible-infectious-recovered (SIR) model is used to simulate and analyze risk propagation within the network. The results highlight distinct risk propagation dynamics triggered by various initial hazardous/controlled factors. Risk factors from the owner or social environment are critical in initiating and controlling propagation, while those from the survey unit, designer, supervision unit, monitoring unit, working environment, or the contractor's organizational and managerial aspects have moderate effects. The contractor-related unsafe behaviors, mechanical, material, or structural factors, and natural environmental factors exhibit relatively limited impact. The ultimate risk level is contingent upon initial hazardous and controlled factors, with the risk controllability solely determined by the latter. It is recommended that the focus of safety management be broadened from contractors to owners and the social environment, and from isolated risk responses to risk network management. This study may deepen managers' understanding of the sources of safety risk within CCPs, thereby promoting project success.

Keyword :

Association rule mining Association rule mining Complex construction project Complex construction project Link prediction Link prediction Safety risk propagation Safety risk propagation SIR model SIR model

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 Fu, Lipeng , Li, Xueqi , Wang, Xueqing et al. Safety risk propagation in complex construction projects: Insights from metro deep foundation pit projects [J]. | RELIABILITY ENGINEERING & SYSTEM SAFETY , 2025 , 257 .
MLA Fu, Lipeng et al. "Safety risk propagation in complex construction projects: Insights from metro deep foundation pit projects" . | RELIABILITY ENGINEERING & SYSTEM SAFETY 257 (2025) .
APA Fu, Lipeng , Li, Xueqi , Wang, Xueqing , Li, Mengnan . Safety risk propagation in complex construction projects: Insights from metro deep foundation pit projects . | RELIABILITY ENGINEERING & SYSTEM SAFETY , 2025 , 257 .
Export to NoteExpress RIS BibTex

Version :

Safety risk propagation in complex construction projects: Insights from metro deep foundation pit projects Scopus
期刊论文 | 2025 , 257 | Reliability Engineering and System Safety
Safety risk propagation in complex construction projects: Insights from metro deep foundation pit projects EI
期刊论文 | 2025 , 257 | Reliability Engineering and System Safety
10| 20| 50 per page
< Page ,Total 1 >

Export

Results:

Selected

to

Format:
Online/Total:1/10460061
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1