• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
成果搜索
High Impact Results & Cited Count Trend for Year Keyword Cloud and Partner Relationship

Query:

学者姓名:范冰辉

Refining:

Language

Submit

Clean All

Sort by:
Default
  • Default
  • Title
  • Year
  • WOS Cited Count
  • Impact factor
  • Ascending
  • Descending
< Page ,Total 3 >
30 m预应力UHPC箱梁抗弯性能试验及结构优化研究 CSCD PKU
期刊论文 | 2024 , 54 (03) , 93-99 | 桥梁建设
Abstract&Keyword Cite

Abstract :

为了解大尺寸预应力UHPC箱梁的抗弯性能,以预应力UHPC公路桥——河北石磁跨线桥为背景,设计、制作1片长30 m的足尺预应力UHPC箱梁模型进行四点弯曲试验,结合有限元计算结果,分析试验现象及裂缝分布、跨中荷载~位移曲线、受拉区UHPC及筋材应力~应变曲线。在此基础上分别考虑普通钢筋配筋情况、预应力筋数、腹板厚度和底板厚度等参数对预应力UHPC箱梁进行结构优化设计研究。结果表明:箱梁破坏时受压区UHPC未压溃、受拉区钢纤维被拔出,裂缝贯通底板;根据荷载~位移曲线,箱梁受力可分为弹性阶段、裂缝发展阶段、裂缝快速发展阶段和破坏阶段;根据应力~应变曲线,受拉区UHPC在纵筋屈服时仍能贡献抗拉能力;试验现象及力学指标实测值均说明了预应力UHPC箱梁抗弯能力还有很大富裕空间,可进一步优化。完全不配置普通钢筋的预应力UHPC箱梁仍能满足抗弯承载能力极限状态设计要求;底部预应力筋数增多可有效提高受压区UHPC的抗压强度利用率;腹板厚度过薄会造成腹板主拉应力过大问题,不宜薄于8 cm;采用体外预应力的方法可有效减薄底板所需厚度。

Keyword :

抗弯性能 抗弯性能 有限元法 有限元法 破坏形态 破坏形态 结构优化 结构优化 裂缝分布 裂缝分布 足尺模型试验 足尺模型试验 预应力UHPC箱梁 预应力UHPC箱梁

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 马熙伦 , 唐梓轩 , 陈宝春 et al. 30 m预应力UHPC箱梁抗弯性能试验及结构优化研究 [J]. | 桥梁建设 , 2024 , 54 (03) : 93-99 .
MLA 马熙伦 et al. "30 m预应力UHPC箱梁抗弯性能试验及结构优化研究" . | 桥梁建设 54 . 03 (2024) : 93-99 .
APA 马熙伦 , 唐梓轩 , 陈宝春 , 范冰辉 . 30 m预应力UHPC箱梁抗弯性能试验及结构优化研究 . | 桥梁建设 , 2024 , 54 (03) , 93-99 .
Export to NoteExpress RIS BibTex

Version :

Robustness-Based Condition Evaluation Framework for Through Tied-Arch Bridge SCIE
期刊论文 | 2023 , 37 (2) | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES
WoS CC Cited Count: 2
Abstract&Keyword Cite

Abstract :

For through tied-arch bridges, the corrosion and degradation of the cable's load-bearing capacity are the main external causes of cable breakage and subsequent structural failure; nevertheless, the progressive collapse after cable breakage is primarily attributed to the weak structural robustness, which makes a huge potential risk of bridge operation and maintenance (O & M). Whereas, as the basis of O & M, current condition evaluation method has not yet taken into consideration the influence of different consequences of cable breakage, resulting in unscientific conclusions for O & M decisions frequently. In this study, a robustness-based condition evaluation framework for the overall structure of the through tied-arch bridge is presented, consisting of three stages: (1) structural robustness assessment associated with tie-bar and suspender failure respectively; (2) classification of evaluation process by the results of robustness assessment, within which the overall structure is either evaluated using the code method or evaluated directly as unqualified (Condition I and II), or the structural member weightings are adjusted according to the robustness weightings (Condition III); and (3) condition evaluation of entire bridge. The evaluation processes of three conditions are further presented in accordance with the tied-arch structure and suspended deck system. To establish the robustness weightings in Condition III, the safety redundancy indexes of through tied-arch structures as well as the suspended deck system are calculated separately, combined with robustness assessment result. Applying the proposed framework to evaluating the condition of a through tied-arch bridge with different structures, the analysis and comparison indicates that, due to the robustness of the through tied-arch structure and suspended deck system, the variation in the potential risk of accidents induced by cable failure is shown intuitively through the evaluation results, which better meets the needs of guiding bridge O & M decisions consequently.

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 Fan, Bing-hui , Wang, Su-guo , Chen, Bao-chun et al. Robustness-Based Condition Evaluation Framework for Through Tied-Arch Bridge [J]. | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES , 2023 , 37 (2) .
MLA Fan, Bing-hui et al. "Robustness-Based Condition Evaluation Framework for Through Tied-Arch Bridge" . | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES 37 . 2 (2023) .
APA Fan, Bing-hui , Wang, Su-guo , Chen, Bao-chun , Chao, Peng-fei , Sun, Qi . Robustness-Based Condition Evaluation Framework for Through Tied-Arch Bridge . | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES , 2023 , 37 (2) .
Export to NoteExpress RIS BibTex

Version :

基于BIM参数化的室内空间净高优化方法
期刊论文 | 2022 , 20 (5) , 172-177 | 水利与建筑工程学报
Abstract&Keyword Cite

Abstract :

民用建筑设计中通常存在空间净高不足的问题.为充分利用有限的建筑空间,基于BIM参数化技术建立空间净高优化方法.首先进行Revit三维建模,应用Navisworks平台对建筑空间管线进行碰撞检测,结合管线排布原则进行初步优化;继而结合Dynamo可视化编程开发参数化插件,以自动检测空间净高,对管线排布进行二次优化,直至达到目标净高.以某高铁客运站工程进行案例分析,结果表明该方法在原有楼层高度的基础上,可通过对管线的合理布置与优化,便捷高效地充分利用建筑室内空间而增加净高.

Keyword :

Dynamo可视化编程 Dynamo可视化编程 参数化设计 参数化设计 建筑信息模型(BIM) 建筑信息模型(BIM) 碰撞检测 碰撞检测 空间净高 空间净高

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 范冰辉 , 孙绮 , 陈铿 et al. 基于BIM参数化的室内空间净高优化方法 [J]. | 水利与建筑工程学报 , 2022 , 20 (5) : 172-177 .
MLA 范冰辉 et al. "基于BIM参数化的室内空间净高优化方法" . | 水利与建筑工程学报 20 . 5 (2022) : 172-177 .
APA 范冰辉 , 孙绮 , 陈铿 , 张岩清 , 黄向宁 . 基于BIM参数化的室内空间净高优化方法 . | 水利与建筑工程学报 , 2022 , 20 (5) , 172-177 .
Export to NoteExpress RIS BibTex

Version :

Robustness Assessment Framework for Through Tied-Arch Bridge Considering Tie-Bar Failure SCIE
期刊论文 | 2022 , 27 (5) | JOURNAL OF BRIDGE ENGINEERING
Abstract&Keyword Cite

Abstract :

Compared with those of other bridge types, the structural system of through tied-arch bridges is particularly susceptible to failure owing to the deterioration and fracturing of tie-bars as well as a lack of structural robustness, which are the main internal and external causes of progressive collapse accidents, respectively. In particular, low structural robustness strongly influences the severity of accidents induced by tie-bar breakage. To objectively reflect the possible failure mode induced by tie-bar failure and to provide improved structural robustness in through tied-arch bridges, within which the suspended deck system is relatively independent, a robustness assessment framework considering tie-bar failure is proposed in this study, by considering the design and maintenance essentials. First, the main analysis parameters for the extreme-event limit state considering tie-bar failure are put forward, including the critical tie-bar failure rate, partial factor for load effects, transverse reduction factor of multilane loading, dynamic magnification factor of material strength, and reduction factors of residual strength. Second, the quantitative assessment index of structural robustness I-T,I-rob is proposed based on the safety redundancy of the remaining structural members, and robustness assessment rules are put forward in accordance with the different calculation results of I-T,I-rob and horizontal displacement. A typical rigid-framed through tied-arch bridges is assessed using the proposed framework. The assessment results reveal that multiple fortifications against extreme events of tie-bar failure can be established by designing the tie-bars and the piers with sufficient safety features to form the first and final line of defense against the tie-bar breakage effect. Moreover, proper maintenance should be conducted to guarantee the structural robustness of bridges in use. The methodology is well suited for the design of new through tied-arch bridges and to access the robustness of existing bridges to ensure the safety of transportation services.

Keyword :

Progressive collapse Progressive collapse Safety redundancy Safety redundancy Structural robustness Structural robustness Through tied-arch bridge Through tied-arch bridge Tie-bar failure Tie-bar failure

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 Fan, Bing-hui , Wang, Su-guo , Chen, Bao-chun . Robustness Assessment Framework for Through Tied-Arch Bridge Considering Tie-Bar Failure [J]. | JOURNAL OF BRIDGE ENGINEERING , 2022 , 27 (5) .
MLA Fan, Bing-hui et al. "Robustness Assessment Framework for Through Tied-Arch Bridge Considering Tie-Bar Failure" . | JOURNAL OF BRIDGE ENGINEERING 27 . 5 (2022) .
APA Fan, Bing-hui , Wang, Su-guo , Chen, Bao-chun . Robustness Assessment Framework for Through Tied-Arch Bridge Considering Tie-Bar Failure . | JOURNAL OF BRIDGE ENGINEERING , 2022 , 27 (5) .
Export to NoteExpress RIS BibTex

Version :

基于“顶石课程”理念的BIM课程建设
期刊论文 | 2021 , (01) , 70-73 | 高教学刊
Abstract&Keyword Cite

Abstract :

目前,BIM课程建设中存在许多问题,如模型的案例项目较为简易且与实际相差较大;项目之间衔接不完善,对项目的模型未成体系;BIM课程培养方案主要目的是让学生学会相关软件,往往忽略了学生的兴趣培养等;目前这类课程的开设重点集中在一流院校,并把对BIM应用的研究重点放在研究生上;课程设计相互间联系不够紧密,课程设计一般不考虑工程的复杂多变等问题。基于顶石课程理念,在实践教学环节引入BIM技术、在毕业设计方面对BIM技术做要求以及基于顶石课程的BIM课程设置,把BIM技术融入到实践教学中,练习BIM的实际操作,在毕业设计开设BIM方向,既可以让学生了解关于BIM的理论技术,掌握BIM技术的基本应用,在...

Keyword :

BIM课程建设 BIM课程建设 多学科学习 多学科学习 实践教学 实践教学 工学结合 工学结合 毕业设计 毕业设计 顶石课程 顶石课程

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 张挺 , 许莉 , 范冰辉 et al. 基于“顶石课程”理念的BIM课程建设 [J]. | 高教学刊 , 2021 , (01) : 70-73 .
MLA 张挺 et al. "基于“顶石课程”理念的BIM课程建设" . | 高教学刊 01 (2021) : 70-73 .
APA 张挺 , 许莉 , 范冰辉 , 王志滨 , 钟旭盼 . 基于“顶石课程”理念的BIM课程建设 . | 高教学刊 , 2021 , (01) , 70-73 .
Export to NoteExpress RIS BibTex

Version :

Condition evaluation for through and half-through arch bridges considering robustness of suspended deck systems SCIE
期刊论文 | 2021 , 24 (5) , 962-976 | ADVANCES IN STRUCTURAL ENGINEERING
WoS CC Cited Count: 9
Abstract&Keyword Cite

Abstract :

Through and half-through arch bridges is one of the main bridge types in China, having arch ribs and simple suspended deck systems, which are connected by high-strength wire suspenders. However, due to the lack of robustness, the suspended deck systems of these types of bridges caused progressive collapse after the suspender corrosion damage. In this study, the internal structural factor of progressive collapse induced by suspender failure was revealed by comparison of five cases of suspender failure, and the robustness requirement of the suspended deck systems was proposed as redundancy to avoid transverse beam collapse when two supporting suspenders on both ends were broken at the same time. Meanwhile, a typical rigid-framed tied through concrete-filled steel tube arch bridge was investigated, and structural condition evaluation was carried out based on the Chinese standard (JTG/T H21-2011). It was found that the evaluation results of bridges with different deck systems were unreasonable, as the better the robustness was, the worse the condition of the deck system was rated, which would mislead the bridge maintenance decisions. A robustness-based evaluation method was then proposed by adopting different evaluation method according to the robustness of the suspended deck system, which is determined by qualitative classification or quantitative calculation. In addition, weight-adjusting method considering robustness was introduced in the evaluation process. The result showed that the new method could objectively reflect the condition of the bridge and thus fits the needs of bridge maintenance and management better.

Keyword :

arch bridge arch bridge condition evaluation condition evaluation failure failure progressive collapse progressive collapse robustness robustness suspender suspender

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 Fan, Bing-Hui , Su, Jia-Zhan , Chen, Bao-Chun . Condition evaluation for through and half-through arch bridges considering robustness of suspended deck systems [J]. | ADVANCES IN STRUCTURAL ENGINEERING , 2021 , 24 (5) : 962-976 .
MLA Fan, Bing-Hui et al. "Condition evaluation for through and half-through arch bridges considering robustness of suspended deck systems" . | ADVANCES IN STRUCTURAL ENGINEERING 24 . 5 (2021) : 962-976 .
APA Fan, Bing-Hui , Su, Jia-Zhan , Chen, Bao-Chun . Condition evaluation for through and half-through arch bridges considering robustness of suspended deck systems . | ADVANCES IN STRUCTURAL ENGINEERING , 2021 , 24 (5) , 962-976 .
Export to NoteExpress RIS BibTex

Version :

Incorporating BIM in the Final Semester Undergraduate Project of Construction Management - A Case Study in Fuzhou University SCIE
期刊论文 | 2020 , 24 (8) , 2403-2418 | KSCE JOURNAL OF CIVIL ENGINEERING
WoS CC Cited Count: 8
Abstract&Keyword Cite

Abstract :

This pedagogical study presents building information modeling (BIM) education in the final semester construction management (CM) program. The case study conducted in Fuzhou University extends BIM education from a single BIM course in earlier undergraduate years to the senior year's final semester project, which was designed to enable BIM utilization in multiple construction tasks (e.g., 3D site planning). This study consists of two major parts. The first part starts with the newly designed course of the final semester project of CM students. Students' final semester project work is demonstrated depending on their selected deliverable type, which includes full BIM application group work, two partial BIM application types (i.e., construction planning/scheduling, and take-off estimate), and a research dissertation. The second part starts from the research hypothesis of whether the different deliverable type selected by students would affect their perceptions towards the final project and their professional career. Based on a follow-up questionnaire survey to the whole CM student sample aiming to test the hypotheses with statistical analyses (e.g., analysis of variance and the post-hoc analysis), it was indicated that all the four different deliverable types (i.e., subgroups) could lead to consistent perceptions of the final semester project towards their career development. However, subgroup differences were found. For example, students from the subgroup of full BIM application perceived that they had the highest level of hands-on skill enhancement throughout the project, possibly due to the fact that they linked BIM software tools to virtual reality (VR) hardware. Suggestions were provided to update the future BIM pedagogy in the final semester project, such as proper guide of CM students to opt their project deliverable type depending on their career interests, motivations in BIM utilization, and skill development needs. This current study provides insights in BIM education in terms that: 1) BIM education could be enhanced from a single course level to the senior year project in the CM program level; 2) different options offered in the final stage project within the CM curriculum might affect students' perceptions towards BIM or their career development; and 3) the experience learned from this case study could be shared in the global community of construction education to update the curriculum incorporating information and communication technologies (e.g., BIM and VR). Future educational work in BIM could continue adopting existing educational theories (e.g., Bloom's Taxonomy) by addressing the various levels of student learning, and viewing BIM in the bigger picture of digital construction.

Keyword :

BIM education BIM education Building information modeling Building information modeling Construction education Construction education Construction management curriculum Construction management curriculum Virtual reality Virtual reality

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 Wang, Liyuan , Yan, Xueyuan , Fan, Binghui et al. Incorporating BIM in the Final Semester Undergraduate Project of Construction Management - A Case Study in Fuzhou University [J]. | KSCE JOURNAL OF CIVIL ENGINEERING , 2020 , 24 (8) : 2403-2418 .
MLA Wang, Liyuan et al. "Incorporating BIM in the Final Semester Undergraduate Project of Construction Management - A Case Study in Fuzhou University" . | KSCE JOURNAL OF CIVIL ENGINEERING 24 . 8 (2020) : 2403-2418 .
APA Wang, Liyuan , Yan, Xueyuan , Fan, Binghui , Jin, Ruoyu , Yang, Tong , Kapogiannis, Georgios . Incorporating BIM in the Final Semester Undergraduate Project of Construction Management - A Case Study in Fuzhou University . | KSCE JOURNAL OF CIVIL ENGINEERING , 2020 , 24 (8) , 2403-2418 .
Export to NoteExpress RIS BibTex

Version :

基于BIM的跨海大桥施工动态风险评估与可视化平台
期刊论文 | 2020 , 37 (3) , 73-78,84 | 土木工程与管理学报
Abstract&Keyword Cite

Abstract :

为提高跨海大桥工程的施工期风险管理水平,结合风险评估的模糊层次分析法(FAHP),基于BIM平台研发了跨海大桥施工BIM动态风险评估系统;该系统应用过程包括桥梁3D模型创建、风险水平FAHP计算、风险评估结果与BIM模型的链接、风险动态模拟等步骤,包含悬臂浇筑预应力混凝土梁、主墩承台施工等5个施工模拟模块,实现了施工过程风险水平的5D动态可视化;该系统的工程实践表明,通过专家意见与3D模型的交互,直观呈现不同施工形象进度时风险水平的变化,可提供给工程管理者在各施工阶段的风险警示,从而及时采取相应风险控制对策,改善风险管理效率.

Keyword :

3D模型 3D模型 BIM BIM FAHP FAHP 跨海大桥 跨海大桥 风险控制 风险控制

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 范冰辉 , 王素裹 , 刘益宝 . 基于BIM的跨海大桥施工动态风险评估与可视化平台 [J]. | 土木工程与管理学报 , 2020 , 37 (3) : 73-78,84 .
MLA 范冰辉 et al. "基于BIM的跨海大桥施工动态风险评估与可视化平台" . | 土木工程与管理学报 37 . 3 (2020) : 73-78,84 .
APA 范冰辉 , 王素裹 , 刘益宝 . 基于BIM的跨海大桥施工动态风险评估与可视化平台 . | 土木工程与管理学报 , 2020 , 37 (3) , 73-78,84 .
Export to NoteExpress RIS BibTex

Version :

Dynamic Effect of Tie-Bar Failure on Through Tied Arch Bridge SCIE
期刊论文 | 2020 , 34 (5) | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES
Abstract&Keyword Cite

Abstract :

Tie bars on through tied arch bridges are often in poor condition and may serve as an external cause of a tie-bar failure accident; nevertheless, bridge structural robustness contributes greatly in resisting progressive collapse, and poor robustness tends to be the essential internal cause of possible accident. To study the dynamic effect of tie-bar failure of a through tied arch bridge and to reveal the mechanism of how structural robustness reduces dynamic effects, a finite-element model of a typical rigid-frame through tied arch bridge is developed based on the most adverse tie-bar breaking time, a transient-unloading method with equivalent load is adopted to analyze the dynamic response of tie-bar failure, and the results under different working conditions are compared. Furthermore, parameter analysis of the arch-to-pier stiffness ratio is conducted for the dynamic-amplification effect. The results indicate that both the pier and the arch rib have significant dynamic-amplification effects with respect to tie-bar breakage, and the remaining tie bars are the most vulnerable elements of the bridge; thus, they should be considered the most important elements when conducting tie-bar failure analysis; the most adverse breaking time adopted in cable breakage analysis can be taken as 0.01 T; a greater arch-to-pier stiffness ratio is beneficial to reduce the dynamic response brought on by tie-bar breakage; therefore, a rigid-frame through tied arch bridge should be designed with a large pier thrust stiffness, while a simply supported tied arch bridge should not be used in future through arch bridges, and existing ones should be retrofitted as soon as possible. (c) 2020 American Society of Civil Engineers.

Keyword :

Amplification effect Amplification effect Dynamic response Dynamic response Progressive collapse Progressive collapse Structural robustness Structural robustness Through tied arch bridge Through tied arch bridge Tie-bar breakage Tie-bar breakage

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 Fan, Bing-hui , Wang, Su-guo , Chen, Bao-chun . Dynamic Effect of Tie-Bar Failure on Through Tied Arch Bridge [J]. | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES , 2020 , 34 (5) .
MLA Fan, Bing-hui et al. "Dynamic Effect of Tie-Bar Failure on Through Tied Arch Bridge" . | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES 34 . 5 (2020) .
APA Fan, Bing-hui , Wang, Su-guo , Chen, Bao-chun . Dynamic Effect of Tie-Bar Failure on Through Tied Arch Bridge . | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES , 2020 , 34 (5) .
Export to NoteExpress RIS BibTex

Version :

分段自复位摇摆墙 incoPat
专利 | 2020-08-17 | CN202021707030.3
Abstract&Keyword Cite

Abstract :

本发明涉及一种分段自复位摇摆墙,包括设在基础上的摇摆墙本体,摇摆墙本体由至少两层摇摆墙基体由下至上依次连接而成,摇摆墙基体上沿纵向预埋有若干预留孔道,基座上开设有与预留孔道相配合的通孔,预留孔道内穿设有预应力筋,预应力筋两端装有锚具,摇摆墙基体下端预埋钢棒,预埋钢棒下端由摇摆墙基体伸出,基础、除最顶层的摇摆墙基体外的其余摇摆墙基体的上侧面上均预埋有能与预埋钢棒插接的预埋钢帽,最下层的摇摆墙基体前后两侧与基础经耗能件连接,本摇摆墙采用分段式设计,单体尺寸小运输吊装方便,能减小整体结构的地震反应,有效地减小地震中摇摆墙墙体的内力,避免墙体受力较大处提前发生破坏丧失墙体的有效性。

Cite:

Copy from the list or Export to your reference management。

GB/T 7714 王素裹 , 吴敏 , 范冰辉 . 分段自复位摇摆墙 : CN202021707030.3[P]. | 2020-08-17 .
MLA 王素裹 et al. "分段自复位摇摆墙" : CN202021707030.3. | 2020-08-17 .
APA 王素裹 , 吴敏 , 范冰辉 . 分段自复位摇摆墙 : CN202021707030.3. | 2020-08-17 .
Export to NoteExpress RIS BibTex

Version :

10| 20| 50 per page
< Page ,Total 3 >

Export

Results:

Selected

to

Format:
Online/Total:902/7276252
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1