• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
成果搜索

author:

Hu, Peng (Hu, Peng.) [1] | Chu, Feng (Chu, Feng.) [2]

Indexed by:

EI

Abstract:

As an essential step during product recovery, disassembly has gained widespread attention with the growing awareness of sustainable development, and various problems around disassembly have been investigated. This paper integrates the facility location and disassembly line balancing problem to minimize the total cost as well as minimize the cycle time of the disassembly line. For the studied problem, a bi-objective mixed-integer programming model is formulated. Based on the problem properties, an -constraint method is proposed to solve the studied problem. Numerical experiments on an illustrative example and benchmark instances are conducted to demonstrate our proposed model and method. © 2022 The Authors. This is an open access article under the CC BY-NC-ND license (https://creativecommons.org/licenses/by-nc-nd/4.0/)

Keyword:

Benchmarking Integer programming Location Numerical methods

Community:

  • [ 1 ] [Hu, Peng]Laboratory IBISC, Univ Évry, Université Paris-Saclay, Évry; 91034, France
  • [ 2 ] [Hu, Peng]School of Economics and Management, Fuzhou University, Fuzhou; 350108, China
  • [ 3 ] [Chu, Feng]Laboratory IBISC, Univ Évry, Université Paris-Saclay, Évry; 91034, France

Reprint 's Address:

Email:

Show more details

Related Keywords:

Related Article:

Source :

Year: 2022

Issue: 10

Volume: 55

Page: 1086-1091

Language: English

Cited Count:

WoS CC Cited Count:

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 0

Affiliated Colleges:

Online/Total:61/10069617
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1