Indexed by:
Abstract:
As an essential step during product recovery, disassembly has gained widespread attention with the growing awareness of sustainable development, and various problems around disassembly have been investigated. This paper integrates the facility location and disassembly line balancing problem to minimize the total cost as well as minimize the cycle time of the disassembly line. For the studied problem, a bi-objective mixed-integer programming model is formulated. Based on the problem properties, an -constraint method is proposed to solve the studied problem. Numerical experiments on an illustrative example and benchmark instances are conducted to demonstrate our proposed model and method. © 2022 The Authors. This is an open access article under the CC BY-NC-ND license (https://creativecommons.org/licenses/by-nc-nd/4.0/)
Keyword:
Reprint 's Address:
Email:
Source :
Year: 2022
Issue: 10
Volume: 55
Page: 1086-1091
Language: English
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 0
Affiliated Colleges: