Indexed by:
Abstract:
Aiming at the optimal scheduling of cogeneration microgrid, a microgrid structure including wind energy, energy storage device, solar thermal power station, gas turbine and waste heat boiler is proposed. Based on the uncertainty of wind power output and load forecasting, according to beta distribution wind power output and normal distribution load forecasting, the CHP microgrid optimal scheduling model of photothermal power station is established and solved by genetic algorithm. Finally, the minimum operation cost of the system under different confidence levels is discussed. The results show that the minimum operating cost of the system can be significantly reduced by adding wind power generation into the microgrid structure, and the relationship between the confidence level of load forecasting and the minimum operating cost of the system is studied. © Published under licence by IOP Publishing Ltd.
Keyword:
Reprint 's Address:
Email:
Source :
IOP Conference Series: Earth and Environmental Science
ISSN: 1755-1307
Year: 2020
Issue: 5
Volume: 558
Language: English
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count: 2
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 2
Affiliated Colleges: