• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
成果搜索

author:

Feylizadeh, M.R. (Feylizadeh, M.R..) [1] | Mahmoudi, A. (Mahmoudi, A..) [2] | Bagherpour, M. (Bagherpour, M..) [3] | Li, D.-F. (Li, D.-F..) [4]

Indexed by:

Scopus

Abstract:

Project managers normally investigate how to reduce the total completion time of projects undertaken subject to the pre-determined objectives. The purpose of this paper is compression of total projects' duration subject to influencing factors such as cost, time, quality and risk. In the present study, by considering factors affecting project success such as cost, time, quality and risk, project crashing and fast tracking are both employed then a fuzzy multi-objective non-linear model is proposed. Each project is associated with uncertainty and the lack of consideration of these uncertainties might lead to project failure. In addition, a fuzzy approach has been employed for incorporating the uncertainties associated with activities. In the proposed model, crashing and fast tracking of projects were considered simultaneously for the first time. According to a real case study considered in this paper, after using the proposed model, the cost of compression is also reduced. In addition, we determined which activities have to be crashed or fast tracked in order to attain the objective. The proposed methodology can be practically applied through mega projects such as construction and "Engineering, Procurement, and Construction" (EPC) projects where the deadline closes to being achieved. As another contribution, a unique feature of the proposed model is its capability for taking both crashing and fast-tracking simultaneously into consideration. © 2018-IOS Press and the authors. All rights reserved.

Keyword:

cost; fast tracking; Fuzzy multi-objective model; project crashing; time

Community:

  • [ 1 ] [Feylizadeh, M.R.]Department of Industrial Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran
  • [ 2 ] [Mahmoudi, A.]Department of Industrial Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran
  • [ 3 ] [Bagherpour, M.]Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
  • [ 4 ] [Li, D.-F.]School of Economics and Management, Fuzhou University, Fuzhou, China

Reprint 's Address:

  • [Feylizadeh, M.R.]Department of Industrial Engineering, Shiraz Branch, Islamic Azad UniversityIran

Show more details

Related Keywords:

Related Article:

Source :

Journal of Intelligent and Fuzzy Systems

ISSN: 1064-1246

Year: 2018

Issue: 3

Volume: 35

Page: 3615-3631

1 . 6 3 7

JCR@2018

1 . 7 0 0

JCR@2023

ESI HC Threshold:174

JCR Journal Grade:3

CAS Journal Grade:4

Cited Count:

WoS CC Cited Count:

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 0

Affiliated Colleges:

Online/Total:82/10068534
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1