Risk is an important factor that affects the smooth landing and efficient operation of PPP project, and it is of vital importance for the success of the project to master its risk situation timely. For toll road PPP project, on the basis of literature study and questionnaire survey, the paper constructs the risk early warning index system, and designs a set of risk early warning model based on variable weight extension matter-element and evidence theories. Firstly, a model is built using the variable weight extension matter-element theory, the comprehensive correlation degree of project risk under different experts' perspective is calculated, and the basic reliability function is got after normalization processing. Then, the model is validated by discount coefficient method, and using the evidence theory to synthesize the basic reliability function, the final warning results is got. Taking a toll road PPP project in F provincial as a case to verify the model's rationality and validity, which can provide reference for the risk early warning of toll road PPP project. Copyright © 2018 by Science Press.
Keyword:
Reprint 's Address:
Email:
Source :
Journal of Transportation Systems Engineering and Information Technology
ISSN: 1009-6744
Year: 2018
Issue: 5
Volume: 18
Page: 5-11
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 0
Affiliated Colleges: