Abstract:

The short circuit current can be limited quickly after being detected in the incipient stage of short circuit fault, in this case, the operation safety of power system can be ensured. In this paper, the area surrounded by current half-cycle curve and the time axis is taken as the criterion of early detection on short circuit fault. Combining the characteristics of distribution network short circuit fault with the output features of cascaded H-bridge converter, a method based on three single-phase cascaded H-bridge multi-level converters is proposed in flexible short-current limiting. These converters are connected to the grid via coupled capacitors. The voltage signal is selected as the feedback so that the converters can generate output voltage to achieve the goal of limiting fault current using an appropriate control method. The simulation results show that based on the early detection, the proposed method can suppress the first peak value of the fault current to mitigate the harms and relieve the burden of circuit breaker. In addition, the selection of faulty phases is unnecessary. © 2017, The editorial office of Transaction of China Electrotechnical Society. All right reserved.

Keyword:

Bridge circuits Electric circuit breakers Electric power distribution Fault detection Feedback Flexible electronics Power converters Timing circuits

Community:

  • [ 1 ] [Guo, Moufa]College of Electrical Engineering and Automation, Fuzhou University, Fuzhou; 350116, China
  • [ 2 ] [You, Linxu]College of Electrical Engineering and Automation, Fuzhou University, Fuzhou; 350116, China
  • [ 3 ] [Wei, Xiaoying]Electric Power Research Institute of Fujian Electric Power Co. of State Grid, Fuzhou; 350007, China
  • [ 4 ] [Gao, Wei]College of Electrical Engineering and Automation, Fuzhou University, Fuzhou; 350116, China
  • [ 5 ] [Yang, Gengjie]College of Electrical Engineering and Automation, Fuzhou University, Fuzhou; 350116, China

Reprint 's Address:

  • 郭谋发

    [guo, moufa]college of electrical engineering and automation, fuzhou university, fuzhou; 350116, china

Show more details

Related Keywords:

Related Article:

Source :

Transactions of China Electrotechnical Society

ISSN: 1000-6753

CN: 11-2188/TM

Year: 2017

Issue: 11

Volume: 32

Page: 48-56

Cited Count:

WoS CC Cited Count: 0

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 2

Online/Total:103/9996295
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1