Abstract:
The calculation method of expansion cost for the weakly meshed distribution network was derived by introducing the shunt coefficient matrix. The electricity energy, expansion cost and power loss produced by DG integration were considered by the objective function and the capacity proportion of environment-friendly DG integration was required in the constraints. Based on the above analysis, a DG programming model in view of time series correlation of wind-light-load was established. The Improved Latin hypercube sampling method taking into account changing intervals of correlation (CI-LHS) and the particle swarm optimization algorithm were utilized to solve the DG programming model. Compared to different scenarios, the rationality and validity of the model for DG planning in terms of CI-LHS were demonstrated. © 2017, Editorial Board of Acta Energiae Solaris Sinica. All right reserved.
Keyword:
Reprint 's Address:
Email:
Version:
Source :
Acta Energiae Solaris Sinica
ISSN: 0254-0096
CN: 11-2082/TK
Year: 2017
Issue: 8
Volume: 38
Page: 2219-2227
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 1
Affiliated Colleges: